Q4 RESOURCE PLANNING

SCM Ops · Plan B

ALTERNATIVE SCENARIO · 29 OCT 2026

Dedicated capacity first. Trace every planned MD to its project and owner.

PLAN B · H1 HANDOVER SCENARIO

Alternative Handover plan · 11 projects

Handover 59.26 MD versus 116.40 MD in the current version (−57.14 MD). PM Nick is included in H1; no additional fixed PM allocation. L1.5 Engineer: Ruby Yang.

Open current version ↗ · Other domain, QA and portfolio links continue to open the current version.

Q4 plan = source Allocate + source Remain. These are planning entries, not consumed timesheet effort. Adjust the usable Q4 capacity reference below, as in MP&A; changes are saved in this browser.
Adjust for holidays and leave. This changes the reference only; planned MD stays unchanged.
Planning reference:Within referenceAbove referenceInput pendingBar = total planned MD / editable reference. Work categories are listed below each card.
QA ALLOCATION DETAIL

PROJECT & ACTIVITY ALLOCATION

CSCOP #Project / activityCategoryAllocate MDRemain MDTotal MD